PMC102
Concrete construction method
- - Install guide line off 1100mm from a rear parking line.
- - Fix a car stoper template with the guide line and then mark a drilling site.
- - Drill a hole Ø17, 50mm depth by a hammer drill.
- - Fix an anchor by inser of set anchor.
- - Insert a car stopper to fixed anchor, tighten the nut.
- - Complete after put of the cap & cleaning.
Asphalt(high pressure block) construction method
- - Make holes Ø17 and 120~150mm in depth, using a hammer drill.
- - Clean up the hole using a blow gun.
- - Fill the hole with epoxy bond to about 1/3 of depth.
- - Align the car stopper with the holes, insert screw bolts, and tighten the screw bolt.
- ※Use an electric or air impact wrench.
- - Put of the cap & clean the product for finish.
- ※Full thread bolt or long set anchors may be used according to the floor condition.
FEATURES
- The optimal contact angle with wheels minimizes parking impacts.
- 3D design and vivid color provide better visibility.
- The top quality reflector guarantees smooth parking at night.
- Durability is increased thanks to no corrosion by pollutants.
- Production by injection process enables the quality and features of the product elaborate and consistent.
- Mass-production and dry techniques are used.
- Customer’s name or logo and production dates can be printed on the face of product.