PMC102

    Concrete construction method

  • - Install guide line off 1100mm from a rear parking line.
  • - Fix a car stoper template with the guide line and then mark a drilling site.
  • - Drill a hole Ø17, 50mm depth by a hammer drill.
  • - Fix an anchor by inser of set anchor.
  • - Insert a car stopper to fixed anchor, tighten the nut.
  • - Complete after put of the cap & cleaning.

    Asphalt(high pressure block) construction method

  • - Make holes Ø17 and 120~150mm in depth, using a hammer drill.
  • - Clean up the hole using a blow gun.
  • - Fill the hole with epoxy bond to about 1/3 of depth.
  • - Align the car stopper with the holes, insert screw bolts, and tighten the screw bolt.
  • ※Use an electric or air impact wrench.
  • - Put of the cap & clean the product for finish.
  • ※Full thread bolt or long set anchors may be used according to the floor condition.

    FEATURES

  • The optimal contact angle with wheels minimizes parking impacts.
  • 3D design and vivid color provide better visibility.
  • The top quality reflector guarantees smooth parking at night.
  • Durability is increased thanks to no corrosion by pollutants.
  • Production by injection process enables the quality and features of the product elaborate and consistent.
  • Mass-production and dry techniques are used.
  • Customer’s name or logo and production dates can be printed on the face of product.